Work on Upper Cliff – Sunday 25th November

22 November, 2012 at 18:00

As a “heads up”, we will be doing maintenance on Upper Cliff over on the Monkey Trail. The plan is to install a pipe in the first left hand berm and do general repairs on the trail. Rather than closing the complete section, we will erect a temporary local diversion – please observe the warning signs.

The ‘Black Rocks’ may also be closed while we tidy up and cut back the trees on the lower section – again please observe the signage.

Andrew