Fill that hole – Trail building

5 May, 2013 at 21:00
Whilst the “race crew” were off racing in the Singletrack 6hr Enduro, it was business as usual for the rest of the crew – trail maintenance on “Snap it”, the section before the “Upper Cliff” descent.
The main issue was the larger hole – we were going to fix it a few weeks back, but decided to leave it in case it improved … evidently, if you’ve ridden in the past few weeks, it hadn’t.
So it was filled with a few dozen large stones then surfaced with material from a nearby “borrow pit” (basically digging suitable material from a nearby source) and wackered flat.
All finished! Lovely and smooth.
William