It’s finally open – Trail Building

12 May, 2013 at 21:00

The Forestry Engineer’s inspection of “Pot of Gold” and the “Roller Coaster” had picked up a few things that needed tweaking before we could open these contractor built sections. So, with help from new faces Matt and Stuart (thanks guys), we loaded up and headed over to Deercote Valley.

After making the required changes, the closed sections were debrashed ready for a quick try. The only test pilot with a bike was Dave so donning his helmet, he pedalled off into the distance. Minutes later he came into sight grinning from ear to ear – I get the feeling he’d enjoyed his quick blast down the new trail.

The surface of the trail is still new and soft so please take it easy – remember “skids are for kids” as they say.

Andrew